Also in the air exhaust from the cyclone were total counts of bacteria and viruses several times higher than those of suburban ambient air. Louis demonstration plant will need an emissions control device for particulates from the large de-entrainment cyclone. Future plants using an air classification system of the type used at the St. ![]() The average overall processing rate for the period was 168 Mg/8-hr day (185.5 tons/8-hr day) at 31.0 Mg/hr (34.2 tons/hr). Average operating costs for the entire evaluation period more » were $8.26/Mg ($7.49/ton). Refuse derived fuel (RDF) is the major product (80.6% by weight) of the refuse processing plant, the other being ferrous metal scrap, a marketable by-product. Data on plant material flows and operating parameters, plant operating costs, characteristics of plant material flows, and emissions from various processing operations were obtained during a testing program encompassing 53 calendar weeks. Louis-Union Electric Refuse Fuel Project, including equipment and facilities as well as assessment of environmental emissions at both the processing and power plants. The report presents the results of processing plant evaluations of the St. « lessĪuthors: Fiscus, D E Gorman, P G Schrag, M P Shannon, L J Publication Date: Thu Sep 01 00:00: Research Org.: Midwest Research Institute, Kansas City, MO (United States) OSTI Identifier: 5346313 Report Number(s): EPA-600/2-77-155a ON: DE82901403 Resource Type: Technical Report Resource Relation: Other Information: Portions of this report are illegible Country of Publication: United States Language: English Subject: 20 FOSSIL-FUELED POWER PLANTS REFUSE-FUELED POWER PLANTS ENVIRONMENTAL EFFECTS OPERATING COST WASTE PROCESSING PLANTS EVALUATION BOILER FUELS CLASSIFICATION DEMONSTRATION PLANTS ELECTRIC UTILITIES IRON MISSOURI POWER PLANTS REFUSE DERIVED FUELS SCRAP METALS COST ELEMENTS FEDERAL REGION VII FUELS INDUSTRIAL PLANTS METALS NORTH AMERICA PUBLIC UTILITIES SCRAP SOLID WASTES THERMAL POWER PLANTS TRANSITION ELEMENTS USA WASTES 200103* - Fossil-Fueled Power Plants- Waste-Fueled Systems 200202 - Fossil-Fueled Power Plants- Waste Management- Noxious Gas & Particulate = , No water effluent or noise exposure problems were encountered, although landfill leachate mixed with ground water could result in contamination, given low dilution more » rates. ![]() The average overall processing rate for the period was 168 Mg/8-h day (185.5 tons/8-h day) at 31.0 Mg/h (34.2 tons/h). ![]() ![]() Average operating costs for the entire evaluation period were $8.26/Mg ($7.49/ton). Louis-Union Electric Refuse Fuel Project, including equipment and facilities as well as assessment of environmental emissions at both the processing and the power plants. The results are presented of processing plant evaluations of the St.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |